Customization: | Available |
---|---|
After-sales Service: | 1 Years |
Warranty: | 1 Years |
Suppliers with verified business licenses
Tank body | Q235A/5mm steel sheet |
End plate | Q235A/6mm .ball shape |
Axle | 3 axle HJ brand german type |
Suspension | Mechanical suspension German type HJ brand |
Leaf spring | Leaf spring 10pcs |
Manhole cover | 500mm manhole cover .2 sets |
Tire | 12R22.5 double star brand 12pcs |
Wheel rim | 9.0-22.5 better brand 12pcs |
Discharge valve | 4"disc valve |
Discharge pipe | 4"seamless steel tube |
Outlet pipe | 4"rubber hose.6m |
Kingpin | JOST brand 2" bolt-in king pin |
Landing gear | JOST brand two-speed, manual operating ,heavy duty landing gear 24T |
Engine | Diesel engine: weichai brand model: 4102. |
Air compressor | 37 KW, 0.2Mpa. 1000r/Min |
Compartment | Single |
Braking system | WABCO RE6 relay valve ;T30/30 spring brake chamber;40L air tanks |
ABS | Optional |
Light | LED 8 side lights and 2 rear lights 2 width lamp |
Air-charging system | 2"main hole.2"check valve .1.5"safe valve.0.4Mpa.gauge |
Quadratic blow | 1" diameter check valve |
Painting | Complete chassis sand blasting to clean rust ,1coat of anticorrosive prime,2coats of final paint |
Accessories | One standard tool box,one spare tire carrier,one crank,one shaft head wrench,four side light,two rear light |
Date of delivery | 20 workdays after we received 30% of contract value T/T down paymen |
·More than 20 years professional design and production experience.
·Choose Regular manufacturers purchase materials.
·Use Domestic first-class production equipment.
·Famouse brand trailer parts used,like bpw/fuwa axle,triangle/double star/double coin and so on tires,API VALVES.
·Strict quality control system ensure that each semi trailer is qualified.
Introduction of production process
A.Tanker workshop overview
B,Tanker body auto welding
C,D.Chassis welding by experienced worker
E.Production line
F.Shot blasting for rust cleaning
G.Dust-free painting
H.Finished trailer
·MOQ:1 SET
·Delivery date:25 workdays after we received deposit.
·Payment term:
1.30% contract value as the deposit by T/T,70% contract value payoff before delivery after production finish.
2.40% contract value as the deposit by T/T,60% contract value made by irrevocable L / C at sight.
Welcome your inquiry and visit our factory.