Customization: | Available |
---|---|
After-sales Service: | 1 Years |
Warranty: | 1 Years |
Suppliers with verified business licenses
MOQ,payment terms,delivery terms,price
|
|||||
MOQ
|
One unit
|
||||
Payment terms
|
T/T 30% down payment, 70% balance after inspection before delivery
|
||||
Inspection
|
Buyer's agent or third party inspection agency,the cost is paid by the buyer
|
||||
Delivery term
|
20 days from down payment
|
||||
Documentation
|
Maintenance manual
|
||||
User manual
|
|||||
Packing list
|
|||||
Commercial invoice
|
|||||
Certificate of origin is optional
|
|||||
Spare parts list for purchase is optional
|
|||||
Standard tools
|
With standard tools for chassis and fuel tank structure
|
||||
Packing
|
The main vehicle nude and covered with wax, attached parts and tools put into standard export box
|
||||
Other requirements
|
Please fill in here
|
||||
FOB
|
USD
|
||||
CIF
|
USD
|
Shipment
|
Tare weight | 9500kg |
Size | 11000mm*2500mm*3850mm |
Volume | 40M3 |
Tank body | carbon steel 5mm |
End plate | carbon steel 6mm |
Axle | 3 axle FUWA brand 13T |
Suspension | Mechanical suspension |
Leaf spring | 10pcs |
Manhole cover | 500mm manhole cover with breath valve .2 sets |
Tire | 12R22.5 double star brand 12pcs |
Wheel rim | 9.0-22.5 better brand 12pcs |
Discharge valve | 4"disc valve API |
Discharge pipe | 4"seamless steel tube |
Bottom valve | 2 set |
Kingpin | JOST brand 2" bolt-in king pin |
Landing gear | JOST brand two-speed, manual operating ,heavy duty landing gear 24T |
Compartment | Single |
Oil gas recovery system | Optional |
Anti overflow system | Optional |
Braking system | WABCO RE6 relay valve ;T30/30 spring brake chamber;40L air tanks |
ABS | Optional |
Light | LED 8 side lights and 2 rear lights 2 width lamp |
Painting | Complete chassis sand blasting to clean rust ,1coat of anticorrosive prime,2coats of final paint |
Accessories | One standard tool box,one spare tire carrier,one crank,one shaft head wrench,four side light,two rear light,two fire extinguisher |
Date of delivery | 20 workdays after we received 30% of contract value T/T down payment. |
Nestled in the historic heart of Fanliangshan, Liangshan Aoding International Trade Co., Ltd. is strategically located where history meets modern trade. The nearby iconic Beijing Hangzhou Canal and the bustling Beijing Kowloon Railway provide effortless connectivity, establishing our locale as a vital trade corridor along the prominent G220 from Jinan to Zhengzhou. Our state-of-the-art production facility, set within the vibrant Liangshan Town Industrial Park, offers unparalleled logistical advantages, ensuring our operations are as seamless as they are innovative.
Established in 2023, Liangshan Aoding International Trade Co., Ltd. is a hallmark of industry excellence, harmonizing visionary design, cutting-edge research and development, precision production, and dynamic sales strategies. Encompassing a sprawling 200-acre expanse, with a well-equipped 60,000 square meter production facility, we are powered by a dedicated team of over 600 professionals, including 18 senior technical engineers at the forefront of innovation. We specialize in crafting unique vehicles that include modified trucks, semi-trailers, dump trucks, tankers, aluminum alloy tank trucks, and bulk cement transport trailers. Our impressive production capacity exceeds 5,000 units annually, featuring concrete mixer trucks and specialized vehicles, reflecting our scale and dedication to impeccable quality. Our advanced technical capabilities, coupled with sophisticated welding and stamping lines, bolster a robust quality assurance system and modern testing methodologies, ensuring our products' stellar reputation. Celebrated nationwide and esteemed on the global stage, our vehicles are exported to over 20 countries, including Russia, the Middle East, Southeast Asia, Africa, and beyond, aligning with the Belt and Road initiatives. We stand as a symbol of reliability and innovative prowess.
Odin Trading embodies a forward-thinking business ethos grounded in relentless innovation and perpetual advancement. With warm hospitality, we extend a heartfelt invitation to esteemed partners from diverse sectors to visit Liangshan, explore promising opportunities, and collaboratively craft a luminous future.
·MOQ:1 SET
·Delivery date:25 workdays after we received deposit.
·Payment term:1.30% contract value as the deposit by T/T,70% contract value payoff before delivery after production finish. 2.40% contract value as the deposit by T/T,60% contract value made by irrevocable L / C at sight.